Add to Book Shelf
Flag as Inappropriate
Email this Book

Civil Reserve Air Fleet Can Respond as Planned, But Incentives May Need Revamping

By General Accounting Office

Click here to view

Book Id: WPLBN0000023442
Format Type: PDF eBook:
File Size: 0.6 MB
Reproduction Date: 2005

Title: Civil Reserve Air Fleet Can Respond as Planned, But Incentives May Need Revamping  
Author: General Accounting Office
Volume:
Language: English
Subject: Government publications, Accountability in government, United States. General Accounting Office
Collections: Government Library Collection, Government Accountability Integrity Reliability Office Collection
Historic
Publication Date:
Publisher: United States General Accounting Office (Gao)

Citation

APA MLA Chicago

Accounting Office, B. G. (n.d.). Civil Reserve Air Fleet Can Respond as Planned, But Incentives May Need Revamping. Retrieved from https://www.gutenberg.us/


Description
Government Accountability Integrity Reliability Office Collection

Excerpt
Excerpt: Civil Reserve Air Fleet participants can respond to an emergency or a war with the required number of aircraft and crews and within the required time frame. Currently, there are more aircraft committed to the fleet than are needed to fill the wartime requirements identified in the DOD Mobility Requirements Study 2005, which determined the requirements to fight and win two major theater wars. However, Civil Reserve Air Fleet requirements may increase the next time mobility requirements are studied. The last mobility requirements study was limited in that it did not consider the use of excess Civil Reserve Air Fleet capacity and the ability of some commercial aircraft to carry larger cargo than standard-sized pallets.

 
 



Copyright © World Library Foundation. All rights reserved. eBooks from Project Gutenberg are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.